Louis L. McAllister Photographs

Louis L. McAllister photographed people and places near Burlington, Vermont for 60 years. He was born in Columbus, Nebraska on October 16, 1876, the son of Julius S. McAllister (born 1841 in Lincoln, VT) and Rosette Gould (born in Vermont in 1851). Julius McAllister worked as a photographer and dentist in Washington D.C., Bristol, Vermont and Columbus, Nebraska. Around 1895, Julius, his third wife Amy, and their children left Nebraska for the Union Soldiers’ Colony in Fitzgerald, Georgia. By 1900, Julius and Amy were divorced, and Amy and her stepson Louis were working as photographers in Thomasville, Georgia. In 1907 Louis McAllister married Cora Shepard (born about 1872 in Vermont) in Holland, Michigan. By 1910, they were living in Queen City Park in South Burlington, Vermont, where Louis established a photography studio. The McAllisters moved to Burlington, and by 1919 they lived at 47 N. Winooski Avenue. They continued to occupy a summer cottage at Queen City Park, and were active in the Queen City Park Association, which held spiritualist camp meetings annually. McAllister conducted his photography business from home until his death in 1963. McAllister’s “trademark” was his panorama camera which made him familiar to all sorts of groups ranging from graduating classes to state police to summer camp groups. In addition he did print 8 x 10 photos, many of which document building construction and Burlington Street Department projects, as well as group and individual portraits. The L.L. McAllister Collection includes portraits, construction projects, buildings, businesses and events in the Burlington area covering the period ca. 1920-1960. The collection also includes photos of street, bridge, airport and sewer construction and repair, as well as group portraits of clubs, schools, etc. Revised April, 2010

Showing 4171 - 4180 of 4224 Records

Burlington Streets: Barrett Street
Image nop
    • Date Created: 1931-08-04
    • Description: Photograph dated Aug. 4, 1941. Original caption reads: Barrett Street Improvements: This view shows the Rossetti residence before any reconstruction work was started with the exception of the placing of the forms and pouring the sub-footings for the northerly half of the reinforced concrete foundation walls.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: Church Street
    Image nop
      • Date Created: undated
      • Description: View from lower Church Street looking north to the Unitarian Church at the head of the street. Photo taken after a major winter snowstorm. Trolley tracks have been cleared and run down the middle of the road (not used after 1929). Possible date 1920s.
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Streets: College Street
      Image nop
        • Date Created: 1929-10-19 00:00:00
        • Description: Oct. 19, 1929 dated photo. College Street looking west from the intersection of So. Union St. and College. Extreme left is the College Street Congregational Church. Further up the street on the same side is the Fletcher Free Library. Elm trees and parked automobiles on both sides.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Streets: College Street
        Image nop
          • Date Created: 1941-03-28 00:00:00
          • Description: Mar. 28, 1941 dated photo. View of sewer construction on College Street looking westerly from South Prospect Street in front of the University of Vermont's new Waterman Memorial Building. The Street Department's Universal Crane can be seen in the distance handling excavation with the clamshell bucket and lowering tile into the trench. Elm trees line the street.
          • Parent Collections: Louis L. McAllister Photographs


          Burlington Streets: East Ave.
          Image nop
            • Date Created: 1938-02-26 00:00:00
            • Description: Feb. 26, 1938 dated photo. East Avenue from near Colchester Avenue looking South, WPA (Work Projects Administration) Project No. 65-12-336. This view shows the widening project carried on during the winter months. This street was widened to a total width of thirty feet and a slope of 1 -1 1/2 was given to the shoulders. The old power line was reconstructed with new poles and fixtures and placed in a position to allow for future development. Another project is being prepared for future development of a new pavement and further widening at the south end of this street.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: Grove St.
            Image nop
              • Date Created: 1940-11-21
              • Description: Photograph dated Nov. 21, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is taken from a point exactly on the City limits on Grove Street looking in a north-westerly direction. The pavement area as far as shown in this view is only a temporary surface. No telford base or penetration surface having been constructed for the last 1,000 feet because the project for the sewer and water mains was not continued to the City limits as originally intended. All grading was done, however, and a corrugated metal culvert with concrete headers and catch basins was constructed in the ravine as shown by the location of white guard posts in the center of this picture.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Streets: Intervale
              Image nop
                • Date Created: 1939-08-15 00:00:00
                • Description: August 15, 1939 PWA Project Vt. 1097-F, Intersection of Intervale Avenue, Elmwood Avenue and North Street. This view shows the broad intersection of the three above streets after the completion of the Plant-Mix asphalt pavement consisting of a leveling course averaging approximately one and one-half inches in thickness and a wearing course of two inches in thickness. The leveling course was constructed with coarse aggregate or "Binder" material with 50-60 penetration asphalt cement. The wearing surface was constructed with fine aggregate using a mixture of 50-60 penetration asphalt cement and American Bitumuls tempering fluid.
                • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


                Burlington Streets: Intervale
                Image nop
                  • Date Created: 1946-06-29 00:00:00
                  • Description: June 29, 1946. Burlington Street Department - Burlington, Vermont. Intervale Road - Asphalt Stabilized base and Armor Coat Wearing Surface. This view taken from the intersection of Riverside Ave. looking northerly toward the railroad track shows the mixing process while constructing the stabilized base using asphalt emulsion (XRM) as a binder. The materials used for aggregate on this job was road gravel hauled from the Lunderville Pit in the town of Williston last October (1945) and spread approximately 28 feet in width over the entire section from Riverside Ave. to the railroad crossing, a distance of approximately 875 feet. Note the Allis-Chalmers Power Grader mixing the gravel after the asphalt emulsion had been applied by pressure distributor. The Armor Coat Wearing surface was constructed directly after the stabilized base had been completed. This is a very economical type of paving, especially where a cheaper grade of materials can be used and the location does not demand a higher type of pavement.
                  • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


                  Burlington Streets: Lakeside Ave
                  Image nop
                    • Date Created: 1944-08-03 00:00:00
                    • Description: August 3, 1944. This view taken from the easterly side of Pine St. at the intersection of Lakeside Ave. shows the old 18 foot concrete pavement as it appeared on Aug. 3, 1944, before construction work began. The pole line on the left side of the pavement had just been reset to clear the center line of the pavement a distance of 26 feet, allowing for the proposed 12 foot shoulder. Note the stone monument in the foreground which marks the intersection of the center line of Pine St. and the center line of Lakeside Ave. This monument will be reset with a lamphole frame and cover for protection during construction work. Note Bell Aircraft employees cars parked in parking lot on left, also railroad underpass in back ground which is approximate westerly end of project.
                    • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


                    Burlington Streets: Locust St.
                    Image nop
                      • Date Created: undated
                      • Description: Undated photo but may be 1930s road construction by city street dept. A portion of the road has been dug up.
                      • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs