Showing 1111 - 1120 of 9221 Records
Champlain Transportation Co. - Ferry Construction
-
Image nop
- Date Created: 1936
- Description: 1936 photo of a Cooper Bessemer engine in place aboard a Champlain Transportation Company ferry.
- Parent Collections: Louis L. McAllister Photographs
Fanny Allen Hospital - School of Nursing Chapel
-
Image nop
- Description: Undated photo of the interior of the Fanny Allen Hospital School of Nursing Chapel. Photo #6.
- Parent Collections: Louis L. McAllister Photographs
Portraits - Family
-
Image nop
- Date Created: 1945
- Description: 1945 indoor photo of a woman and two sailors, very likely a mother and her two sons. A portrait of the sailor on the left can be seen on the wall (right). Same location as mcalB14F22i10 with more family members.
- Parent Collections: Louis L. McAllister Photographs
Portraits - Family
-
Image nop
- Date Created: 1945
- Description: 1945 indoor photo of a couple with their young daughter and son, taken at Christmas. They are seen in mcalB14F24i24-mcalB14F24i25, also.
- Parent Collections: Louis L. McAllister Photographs
Portraits - Family
-
Image nop
- Date Created: 1947-1948
- Description: Ca. 1947 photo of the parents of the family seen in mcalB14F26i01.
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1935-07-18
- Description: July 18, 1935. Photo #13. Caption on this 1935 photo reads "#13 Burlington, Vt. 7-18-35 VERA (Vermont Emergency Relief Administration) Proj 402-B15-1 Burlington Municipal Airport - West end of E. + W. runway. Construction of Armour coat. Note chestnut stone before application of Colas emulsion: note stablized (?) constructed with American Bitumuls special (?) in 4 in. thickness?
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1934-11-27
- Description: November 27, 1934. Photo #20A. This picture shows the starting of the grading of the east-west runway, just east of its junction with the north-south runway. Hand labor was used as much as possible in accordance with the V.E.R.A (Vermont Emergency Relief Administration) principles. Caption on this 1934 photo reads ""#20A 11-27-34 Municipal Air Port Project - Grading East end of East and West runway with VERA labor."
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1934-07-27
- Description: July 27, 1934. Photo # 4A. A view looking north from south end of the north-south runway showing the grading work in process which was done under the V.E.R.A. (Vermont Emergency Relief Administration). Note the opening at northern end where the trees and undergrowth have been removed to obtain better vision. Caption on this 1934 photo of construction of the Burlington Municipal Airport reads "#4A 7-27-34 Grading North and South Runway with VERA labor looking North from South end of runway."
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1935-06-12
- Description: June 12, 1935. Photo #5A. Caption on this 1935 photo reads "#5A Burlington Vt. 6-12-35 VERA (Vermont Emergency Relief Administration) Proj #402-B15-1 Burlington Municipal Airport. General view of soil stabilization work on E + W Runway by The American Bitumuls Co.
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1937-06-11
- Description: This view shows the new timber hangar as it appeared June 11, 1937 during the early stages of construction at the Burlington Municipal Airport.
- Parent Collections: Louis L. McAllister Photographs