Showing 1651 - 1660 of +10000 Records

Burlington Streets: Grove St.
Image nop
    • Date Created: 1938-07-27
    • Description: Photograph dated July 27, 1938. A view of the construction site of the new Grove Street bridge. Photograph taken from the opposite direction of photograph no. 13.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: Grove St.
    Image nop
      • Date Created: 1940-11-21
      • Description: Photograph dated Nov. 21, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the improvements on Grove Street looking in the opposite direction from the view shown in the previous picture.
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Streets: Hayward St. & Hayward St. Sewer
      Image nop
        • Date Created: 1942-05-25
        • Description: May 25, 1942. Hayward Street Improvements Project: This view shows Hayward Street looking northerly to the intersection of Marble Ave. The excavation of the old pavement was partially done last winter and completed this month after which the sand cushion and telford stone base was constructed and the penetration course of chestnut stone has been spread over the telford base and roughly graded ready for rolling with the 15 ton steam roller. Note the condition of the old curbs which will be reset or replaced, as the condition warrants.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Streets: Home Ave.
        Image nop
          • Date Created: 1934
          • Description: May 2, 1934. South End P.W.A. Sewer Project Docket No. 2353 A Section of Home Avenue near Wells Street. Note that ledge is encountered the entire depth from ground level to grade of sewer. The truck appears to contain the power source via tubing for the hand-held jack hammer one of the workmen holds.
          • Parent Collections: Louis L. McAllister Photographs


          Burlington Streets: Hungerford Terrace
          Image nop
            • Date Created: 1940
            • Description: Allis-Chalmers, Model IB Tractor with 16 HP Engine, Equipped with a Baker "V" Type Sidewalk Snow Plow. This view shows the Tractor Plow unit proceeding north on Hungerford Terrace after an 8 inch fall of snow combined with rain, which made the plowing very heavy and difficult for horse drawn equipment, but this unit did not experience any difficulties. Note: For a more detailed description see the original print.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: Institute Road
            Image nop
              • Date Created: 1946-10-07
              • Description: October 7, 1946 Institute Road Rock Excavation Street Widening Project showing new sidewalk construction work done by the city street dept.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Streets: Intervale
              Image nop
                • Date Created: 1946-07-29
                • Description: July 29, 1946. Intervale road construction project by the city street dept. Shows road resurfaced near the railroad tracks and crossing sign.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Streets: Lakeside Ave
                Image nop
                  • Date Created: 1945-12-05
                  • Description: December 5, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly toward the Lake Champlain. The new factory building just completed for the Blodgett Co. is shown with parking area base recently constructed between the street line and the building. Note the asphalt emulsion stabilized base which was mixed the previous day before taking this picture. Cold weather and frost conditions had frozen the base mixture on the left half of the street but the job was continued on the north half in spite of the low temperatures as the street had to be put in condition to receive traffic for the winter, this street being on a regular bus line. The job was continued by placing a 2 inch layer of crushed stone on this stabilized base and penetrating the same with asphalt emulsion and covering with concrete sand as a "blotter" for the winter and then opened to traffic. This project will be continued to completion in the spring by constructing an integral concrete curb and gutter on the south side of a 3 inch hot plant mix wearing surface over the entire pavement area. Note the asphalt distributor applying emulsion and the tractor and harrow mixing the base.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Streets: Main Street (Upper)
                  Image nop
                    • Description: Street dept crew resurfacing a portion of Main Street. Seen are several dept vehicles tamping the asphalt, spraying water to keep the dust down and unloading the asphalt. Undated (1930s?)
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Streets: Ledge Road
                    Image nop
                      • Date Created: 1935-10-09
                      • Description: October 9, 1935 view of intersection of Route 7 (Shelburne Road or Street) and bottom of Ledge Road as it ascends up hill to the east. City street dept workmen do road or sewer construction. A dept. truck supplies power.
                      • Parent Collections: Louis L. McAllister Photographs