Showing 11 - 20 of 31 Records
Burlington Streets: North Street
-
Image nop
- Date Created: 1939-08-15
- Description: August 18, 1930. City street dept crew pours cement on resufacing project of North Street between No. Winooski Ave and Elmwood Ave. Emptied cement bags lay on the ground. To the right is 204 North St. location of Paramount Cut Rate Shoppe.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Winooski Ave.(4X5's)
-
Image nop
- Date Created: 1939-08-15
- Description: Photograph dated Aug. 15, 1939. Original caption reads: This view shows the construction of the binder course or leveling course on South Winooski Avenue near the intersection of Howard Street and Saint Paul Street. Note also the penetration base constructed in the gutter at the left side of the picture after the old concrete curbing had been raised approximately nine inches. Note the method used in placing the asphalt mixture with the Adnun asphalt spreader.
- Parent Collections: Louis L. McAllister Photographs
Max Fishman in 1909
-
Image nop
- Date Created: 1939-08-13 00:00:00
- Description: Fishman's Dept. Store in 30th Year August 13, 1939
- Parent Collections: Photographs of Vergennes (Vt.)
Graduation - Unidentified
-
Image nop
- Date Created: 1939
- Description: Photograph of a 1939 photo showing graduates gathered outside on steps with their diplomas. Girls wear white dresses ; boys are in suit and tie. Names written on the bottom of the photo.
- Parent Collections: Louis L. McAllister Photographs
Vermont Alumnus vol. 18 no. 09
-
Image nop
- Creator: University of Vermont
- Date Created: 1939
- Parent Collections: University of Vermont Alumni Publications, Vermont Alumnus
Vermont Alumnus vol. 19 no. 01
-
Image nop
- Creator: University of Vermont
- Date Created: 1939
- Parent Collections: University of Vermont Alumni Publications, Vermont Alumnus
Road Construction (4X5)
-
Image nop
- Description: Photograph dated May 8, 1939. Westward view on an unidentified Burlington Street. Original caption reads: Street construction.
- Parent Collections: Louis L. McAllister Photographs
Sewer Projects
-
Image nop
- Description: November 24, 1939. A dump truck deposits its load at a sewer project site as crew members work nearby. Other trucks and machinery seen.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Bend Street
-
Image nop
- Date Created: 1939-08-15
- Description: August 15, 1939 PWA Project No. Vt. 1097-F This view shows the completed pavement at the intersection of North Bend Street and Ward Street. The old road bed was scarified, reshaped and treated with stabilizing emulsion late in the fall of 1938 and a base course of asphalt penetration was constructed with one application of 85-100 penetration asphalt binder. A wearing surface of two inches of Plant-Max asphalt using tempering fluid was constructed during the early summer of 1939.
- Parent Collections: Louis L. McAllister Photographs
Vermont Alumnus vol. 18 no. 10
-
Image nop
- Creator: University of Vermont
- Date Created: 1939
- Parent Collections: University of Vermont Alumni Publications, Vermont Alumnus