Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 2561 - 2570 of +10000 Records

Burlington Asphalt Plant
Image nop
    • Date Created: undated
    • Description: Burlington Asphalt Plant employees, trucks, horse
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Dump
    Image nop
      • Date Created: 1944-03-18
      • Description: March 18, 1944. This view shows the inside of the Salvage Depot during the process of baling salvage paper and cardboard. The Street Department erected this building with its own employees and with material salvaged from various and sundry jobs. The Street Department purchased this baler and scales for the baling and weighing of salvage materials. The bale of pasteboard and cartons shown on the scales weight approximately 100 lbs. The salvage process will continue at this plant as a regular function of the operation of the Municipal Refuse Disposal Grounds of the Street Department after the War is over and for helping to pay the operating costs of the grounds.
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Streets: Hayward St. & Hayward St. Sewer
      Image nop
        • Date Created: 1942-05-25
        • Description: May 25, 1942. Hayward Street Improvements Project. This view is taken from the intersection of Howard St. looking northerly to the intersection of Marble Ave. The excavation of the old pavement was partially done last winter and completed this month after which the sand cushion and telford stone base was constructed and the penetration course of chestnut stone has been spread over the telford base and roughly graded ready for rolling with the 15 ton steam roller. Note the condition of the old curbs which will be reset or replaced as the condition warrants.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Streets: Howard St.
        Image nop
          • Date Created: 1945-11-09
          • Description: November 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Hayward Street looking westerly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was just bieng completed when this picture was taken. Grading between curb and sidewalk on North Side and in back of curb on South side was completed the following day after picture was taken. The 2 inch asphalt wearing surface was placed on a 3 inch penetration macadam with an 8 inch telford stone base. Drainage tile was laid the entire length of the street on the rear of the curbs on either side and in the center line of the street. All tile was drained with catch basins and manholes.
          • Parent Collections: Louis L. McAllister Photographs


          Burlington Streets: Intervale Rd.
          Image nop
            • Date Created: undated
            • Description: Undated but may be Nov. 1928 view of flood damage to Intervale Road caused by Nov. 4, 1927 flood before construction was started in 1928.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: DeForest Road
            Image nop
              • Date Created: 1932-07-13
              • Description: July 13, 1932 dated photo. #3 DeForest St. 7-13-32. Looking easterly from Pine Grove toward Overlake Park before construction of Telford Stone Base.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Streets: Ferguson Ave.
              Image nop
                • Date Created: undated
                • Description: Undated photograph of a paving project on Ferguson Avenue. The road crew can be seen in the distance.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Streets: Flynn Ave.
                Image nop
                  • Date Created: 1931-04-27
                  • Description: Photograph dated April 27, 1931 looking eastward across the rail crossing on Park Avenue (renamed Flynn Avenue) prior to the widening/paving project.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Streets: Grove St.
                  Image nop
                    • Date Created: 1939-08-15
                    • Description: Photograph is dated Aug. 15, 1939. Original caption reads: WPA [Work Projects Administration] Street Paving Project No. 665-12-2-38(Grove Street) This view shows Grove Street pavement project looking northerly from the Grove Street Bridge after the westerly half of the pavement had been completed. Note the trench at the left where perforated corrugated metal pipe is being installed for underground drainage purposes.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Sand and Gravel Plant
                    Image nop
                      • Date Created: 1935-02-16
                      • Description: February 16, 1935 Photo #1 Burlington Sand and Gravel washing and screening plant in Williston
                      • Parent Collections: Louis L. McAllister Photographs