Showing 3081 - 3090 of 6620 Records
Salvation Army
-
Image nop
- Description: A group of older women and two men, several dressed in Salvation Army uniforms gather around a table with a cake. One woman holds the tip of the American flag. Two crepe paper cat figures adorn the wall behind the group. This photo dates very likely from 1951 or later. (The two couples in uniform closest to the cake may be about to exchange leadership roles. The City Directory lists a few different names of people "in charge" during the early 1950s.)
- Parent Collections: Louis L. McAllister Photographs
Sewer Projects
-
Image nop
- Date Created: 1932-02-19
- Description: February 19, 1932. Members of a crew dig with pick axes at a sewer project site near the Burlington Lake Champlain water front.
- Parent Collections: Louis L. McAllister Photographs
Ticonderoga - Move to Shelburne Museum
-
Image nop
- Date Created: 1955-04-05
- Description: April 5, 1955. Workmen of the W. B. Hill Company lay double tracks upon which the steamship Ticonderoga will cross the Rutland Railroad tracks. The boat nears the end of its overland journey to the Shelburne Museum. The permanent Rutland tracks are seen beneath the double tracks. Photo 159.
- Parent Collections: Louis L. McAllister Photographs
Ticonderoga - Move to Shelburne Museum
-
Image nop
- Date Created: 1955-03-08
- Description: March 8, 1955. The steamship Ticonderoga makes it way along double railroad tracks to the Shelburne Museum. W. B. Hill Company of Tilton, New Hampshire oversees the boat's overland journey. The truck bears the company's signs as does the side of the paddle-boat. Photo 144.
- Parent Collections: Louis L. McAllister Photographs
Ticonderoga - Move to Shelburne Museum
-
Image nop
- Date Created: 1955-02-09
- Description: February 9, 1955. A truck belonging to the W. B. Hill Company of Tilton, New Hampshire is seen between the double railroad tracks in front of the steamship Ticonderoga. The company was subcontracted by Merritt-Chapman & Scott to oversee the boat's overland journey from Shelburne Bay to the Shelburne Museum. Photo 127.
- Parent Collections: Louis L. McAllister Photographs
Trinity College, Burlington
-
Image nop
- Description: McAuley Hall, constructed 1958. Building on the Trinity College campus, Burlington, Vermont. Founded in 1925 by the Sisters of Mercy of Vermont. Closed in 2000. Later purchased by the University of Vermont.
- Parent Collections: Louis L. McAllister Photographs
Trinity College, Burlington
-
Image nop
- Description: A "Queen of the May" gathering, 1954, in front of Mann Hall. "This was the highlight of the [college] Sodality's annual festival in honor of the Blessed Virgin Mary." The three women near the boy are (l.-r.): Suzanne Moore '55, Jo Marie Delaney '55, and Jeanne Boucher, '55. Source: Stephen Roth, A History of Trinity College, 1925-1975, p. 34. Photo #6.
- Parent Collections: Louis L. McAllister Photographs
Unitarian Church
-
Image nop
- Description: First Unitarian Universalist Society of Burlington, Vermont at the head of Church Street (Church Street Marketplace) at 152 Pearl Street. Seen here with wooden scaffolding surrounding the steeple. Date unknown but may be circa 1955 or 1956 when lightening struck the steeple.
- Parent Collections: Louis L. McAllister Photographs
Weddings
-
Image nop
- Description: A bride and groom are seen at the wedding reception with others of their wedding party behind them.
- Parent Collections: Louis L. McAllister Photographs
Winooski Bridge
-
Image nop
- Date Created: 1945-08-24
- Description: August 24, 1945. This view was taken from the Winooski end of the bridge looking toward Colchester Ave. hill. Note the completed hot plant mix wearing surface on the right half of the bridge (asphalt spreader and roller shown in the distance) while two way traffic is suing the left half of the bridge. The crew in the left foreground is removing the old cold-patch aprons which were temporarily placed near the newly installed steel expansion lanes during the previous season. This wearing surface was placed 2 inches in thickness and tapered off on to the approaches at each end. The cost of this work was borne by the City of Winooski and City of Burlington sharing in the proportion of the grand list of each City and the State Highway Department. The State Highway Department paid for 4/5 of the total cost while the other fifth was divided between the two cities.
- Parent Collections: Louis L. McAllister Photographs