Showing 4001 - 4010 of 6620 Records
Burlington Streets: DeForest Road (4X5)
-
Image nop
- Date Created: 1932-10-29 00:00:00
- Description: Oct. 29, 1932 dated photo. #10 DeForest Road. Looking North from Hairpin Curve after Telford Base Construction - Salvaged Macadam Surface.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Grove St.
-
Image nop
- Date Created: 1939-08-15
- Description: Photograph dated Aug. 15, 1939. Original caption reads: WPA (Work Projects Administration) Grove Street Bridge, Project No. 465-12-1-15 This view shows the completed Grove Street Bridge Project which was completed late in the year 1938. It consists of a heavy corrugated steel plate arch with reinforced concrete base, sidewalls, and floor slab, using second-hand building brick for the headwalls and spandrel walls with concrete sidewalks, curbs and gutters and penetration asphalt pavement.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Grove St.
-
Image nop
- Date Created: 1938-10-19
- Description: Photograph dated Oct. 19, 1938. This view shows the construction project (WPA [Work Projects Administration] Grove Street Bridge, Project No. 465-12-1-15) underway in the area adjacent to the bridge on Grove Street looking in a northerly direction from a point opposite the entrance to the W.C. Kirby Garage.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Grove St.
-
Image nop
- Date Created: 1938-07-27
- Description: Photograph dated July 27, 1938. View of the construction project at the site of the new Grove Street bridge (WPA [Work Projects Administration] Grove Street Bridge, Project No. 465-12-1-15). Direction unknown but is from the opposite of the street seen in photograph no.9.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Ferguson Ave.
-
Image nop
- Date Created: 1938-11-01 00:00:00
- Description: A view of Ferguson Avenue dated Nov. 1, 1938
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1942-01-12 00:00:00
- Description: January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1942-12-12
- Description: December 12, 1942. Hayward Street Looking Northerly from Catherine Street. This view shows Hayward street looking northerly from Catherine Street after the binder course of asphalt penetration macadam had been completed and the 2 inch asphalt hot plant mix wearing surface was being constructed. Note the date of this picture, Dec 12, which is probably the latest date at which asphalt pavement construction of this type has ever been attempted in Vermont.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Institute Road
-
Image nop
- Date Created: 1946-04-11
- Description: April 11, 1946 Institute Road - Rock Excavation Street Widening Project. This view taken from the intersection of the road leading to Bishop Hopkins Hall looking easterly toward North Ave. shows the appearance of Institute Road after all rock excavation and widening had been completed ready for the earth fill to be placed on the shoulders.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Home Ave.
-
Image nop
- Date Created: 1934-04-20
- Description: April 20, 1934. P.W.A. South End Sewer P.W. A. Project No. 2353 A Section of Home Avenue looking west from Wells Street. In this section, solid ledge was encountered most of the way. A wooden sign states "Federal Public Works Project No. 2353" Men work in and above the trench.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Howard St.
-
Image nop
- Date Created: 1945-11-09
- Description: November 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was just being completed when this picture was taken. Grading has been completed between sidewalk and curb on north side.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs