Showing 4001 - 4010 of 6620 Records
Burlington Streets: Adams St.
-
Image nop
- Description: Undated photograph of a residence at 48 Adams Street
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Church Street
-
Image nop
- Date Created: undated
- Description: Winter view of Church Street after a major snowstorm. Traffic signal stands at the head of the street with traffic and directional instructions. The New Sherwood Hotel (burned 1937) is seen center right. Retail stores line both sides of the street. Possible date 1936.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Colchester Ave (4X5)
-
Image nop
- Date Created: 1929-09-01
- Description: Sept. 1, 1929 date photo. Colchester Ave. looking upgrade from the intersection of Chase Street just before starting construction of new concrete pavement. Note the roughness of the old surface treated waterbound macadam pavement, also irregular curb and gutter on the right and old trolley track rails on the left where new curb and gutter is to be constructed in order to widen the pavement.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: College Street
-
Image nop
- Date Created: 1929-10-19 00:00:00
- Description: Aug 25, 1929 dated photo. Pouring concrete base on College Street in front of College Street Congregational Church. Note the construction of the base showing dowels spaced 5' on centers. This concrete base was constructed in 3--10' slabs 6" in thickness with 30" gutters on either sides extending 2" above the concrete base allowing for the surface coarse of Asphalt 2" in thickness. This work is all done by City labor and City equipment of the Burlington Street Dept. Fletcher Free Library can be seen in the background on the right.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: College Street (4X5)
-
Image nop
- Date Created: 1929
- Description: 1929 dated photo. College Street looking east from South Winooski Ave. as the construction gang were completing the construction of the concrete base near South Union Street. Note gutter forms in place ready to receive the concrete. 2" strips are used for the forms to allow for the 2" Asphalt pavement which will be constructed on the concrete base. Seen on the right in the background is College Street Congregational Church.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Elmwood Ave.
-
Image nop
- Date Created: 1939-08-15 00:00:00
- Description: Aug. 15, 1939 date photo. PWA Project Vt. 1097-F, Intersection of Intervale Avenue, Elmwood Avenue and North Street. This view shows the broad intersection of the three above streets after the completion of the Plant-Mix apshalt pavement consisting of a leveling course averaging approximately one and one-half inches in thickness and a wearing coarse aggregate or "Binder" material with 50-60 penetration asphalt cement. The wearing surface was constructed with fine aggregate using a mixture of 50-60 penetration asphalt cement and American Bitumuls tempering fluid.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Elmwood Ave.
-
Image nop
- Date Created: 1931-08-28 00:00:00
- Description: Aug. 28, 1931 dated photo. City of Burlington Street Dept vehicles and construction crew on repaving project. American Elms line the street.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: DeForest Road (4X5)
-
Image nop
- Date Created: 1932-10-29 00:00:00
- Description: Oct. 29, 1932 dated photo. #10 DeForest Road. Looking North from Hairpin Curve after Telford Base Construction - Salvaged Macadam Surface.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Grove St.
-
Image nop
- Date Created: 1939-08-15
- Description: Photograph dated Aug. 15, 1939. Original caption reads: WPA (Work Projects Administration) Grove Street Bridge, Project No. 465-12-1-15 This view shows the completed Grove Street Bridge Project which was completed late in the year 1938. It consists of a heavy corrugated steel plate arch with reinforced concrete base, sidewalls, and floor slab, using second-hand building brick for the headwalls and spandrel walls with concrete sidewalks, curbs and gutters and penetration asphalt pavement.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Grove St.
-
Image nop
- Date Created: 1938-10-19
- Description: Photograph dated Oct. 19, 1938. This view shows the construction project (WPA [Work Projects Administration] Grove Street Bridge, Project No. 465-12-1-15) underway in the area adjacent to the bridge on Grove Street looking in a northerly direction from a point opposite the entrance to the W.C. Kirby Garage.
- Parent Collections: Louis L. McAllister Photographs