Burlington Streets: Grove St.
-
Image nop
- Date Created: 1938-07-27
- Description: Photograph dated July 27, 1938. View of the construction project at the site of the new Grove Street bridge (WPA [Work Projects Administration] Grove Street Bridge, Project No. 465-12-1-15). Direction unknown but is from the opposite of the street seen in photograph no.9.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Ferguson Ave.
-
Image nop
- Date Created: 1938-11-01 00:00:00
- Description: A view of Ferguson Avenue dated Nov. 1, 1938
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1942-01-12 00:00:00
- Description: January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1942-12-12
- Description: December 12, 1942. Hayward Street Looking Northerly from Catherine Street. This view shows Hayward street looking northerly from Catherine Street after the binder course of asphalt penetration macadam had been completed and the 2 inch asphalt hot plant mix wearing surface was being constructed. Note the date of this picture, Dec 12, which is probably the latest date at which asphalt pavement construction of this type has ever been attempted in Vermont.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Institute Road
-
Image nop
- Date Created: 1946-04-11
- Description: April 11, 1946 Institute Road - Rock Excavation Street Widening Project. This view taken from the intersection of the road leading to Bishop Hopkins Hall looking easterly toward North Ave. shows the appearance of Institute Road after all rock excavation and widening had been completed ready for the earth fill to be placed on the shoulders.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Home Ave.
-
Image nop
- Date Created: 1934-04-20
- Description: April 20, 1934. P.W.A. South End Sewer P.W. A. Project No. 2353 A Section of Home Avenue looking west from Wells Street. In this section, solid ledge was encountered most of the way. A wooden sign states "Federal Public Works Project No. 2353" Men work in and above the trench.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Howard St.
-
Image nop
- Date Created: 1945-11-09
- Description: November 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was just being completed when this picture was taken. Grading has been completed between sidewalk and curb on north side.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Institute Road
-
Image nop
- Date Created: 1946-06-29 00:00:00
- Description: June 29, 1946 Institute Road - Rock Excavation Street Widening Project. This view shows the westerly end of Institute Road as it appeared on June 29, after the earth fill had been placed for the sidewalk base and the concrete sidewalk for this section has been completed.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Lakeside Ave
-
Image nop
- Date Created: 1945-12-11 00:00:00
- Description: December 11, 1945. City of Burlington, Vermont, Street Department Lakeside Ave. Pavement Base Construction This view was taken from a point near the intersection of Central Ave. looking easterly toward the underpass. Note that the temporary wearing surface had been constructed for the base after the work of mixing and stabilizing the base had been completed as shown in the picture under date of Dec. 5, 1945. This stage of construction was done to enable the street to be used during the winter and early spring without experiencing the troubles of early spring break-up of the old dirt and cinder street. The pavement will be completed in the summer of 1946. Note the crushed stone base placed in the driveway after regrading to meet new grades. To the left in background is the Blodgett Co.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Main Street (Upper)
-
Image nop
- Date Created: undated
- Description: Winter view of Main Street after a heavy snow fall looking northeast and city street dept crew with tractor with spiked wheels pulling truck with attached snowplowing equipment. On the left is 278 Main Street, a Greek revival home. Elm trees line the road. Undated (1920s?)