Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 4121 - 4130 of 9221 Records

Portraits, groups, unidentified
Image nop
    • Description: A gathering of men assemble outside on the steps of an as yet unidentified building, possibly at the University of Vermont. This particular entrance consisting of 4 heavy doors, a dozen or more steps, massive railing, columns, and lamps, seems no longer to exist. The date of the photo may late 1930s or early 1940s. Mc6 is seen in photographer's hand writing indicating his numbering system.
    • Parent Collections: Louis L. McAllister Photographs


    Portraits, groups, unidentified
    Image nop
      • Description: Five uniformed (Catholic?) girls pose for a portrait with five young men dressed in suit and tie. See also mcalA15F07i29
      • Parent Collections: Louis L. McAllister Photographs


      Sewer Projects
      Image nop
        • Date Created: 1938-05-09
        • Description: May 9, 1938. View at a sewer project site with a long deep and narrow trench extending the length of the street. A manhole is seen in the forefront. A shack stands to the right next to a smaller shed. Is this Cliff Street in Burlington? See also mcalA16F13i14
        • Parent Collections: Louis L. McAllister Photographs


        Sewer Projects
        Image nop
          • Description: November 21, 1940. North End Sewer project. This view shows the construction of the Bradley Road section of the North End Sewer. The Austin Excavator is being employed to excavate all materials and deliver with side delivery elevator into trucks where it is transported back and dumped into the ditch for refilling. This view shows the evidence of boulders and ledge encountered in the excavation. Note the absence of sheeting on this project regardless of the depth of the trench which at this point was approximately twelve feet. The top layer of approximately six feet being sand and loam was broken down from the shoulders with the aid of compressed air tools at a slope which did not endanger the men laying the tile. The bottom six or seven feet of excavation was in solid blue clay. Note the straight sides in the bottom of the trench indicating the stability of this material. Very little water was encountered at this point.
          • Parent Collections: Louis L. McAllister Photographs


          Sewer Projects
          Image nop
            • Description: Three members of a crew operate jack hammers in a water filled trench at a sewer project site.
            • Parent Collections: Louis L. McAllister Photographs


            UVM Botany Dept.
            Image nop
              • Description: Man and boy (identity unknown) standing near a building. Relevance to UVM Botany dept. unknown.
              • Parent Collections: Louis L. McAllister Photographs


              Vermont Structural Steel
              Image nop
                • Date Created: 1951
                • Description: 1951 Interior view of the Vermont Structural Steel plant on 207 Flynn Ave, Burlington, Vermont.
                • Parent Collections: Louis L. McAllister Photographs


                Veterans of Foreign Wars
                Image nop
                  • Description: A group of young girls stands, some holding an index size card in their hand, along with three older women for a group portrait. Photo #3.
                  • Parent Collections: Louis L. McAllister Photographs


                  Veterans of Foreign Wars
                  Image nop
                    • Date Created: undated
                    • Description: A group of young girls stand with four older women for a portrait.
                    • Parent Collections: Louis L. McAllister Photographs


                    Weddings
                    Image nop
                      • Description: Photo of a young bride and groom. She wears a full length gown with a tulle veil surrounding her. She holds a bouquet of roses.
                      • Parent Collections: Louis L. McAllister Photographs