Sewer Projects
Image nop
    • Description: Winooski Bridge Construction ; sewer project ; view of rebar supports
    • Parent Collections: Louis L. McAllister Photographs


    Sewer Projects
    Image nop
      • Date Created: 1940-02-23
      • Description: February 23, 1940. This view shows a section of the North End Sewer in front of the Arthur residence just north of Thayer School. The depth of the sewer at this point is approximately sixteen feet. The Austin excavator is being used loading the excavated materials into trucks and dumping it form back filling as fast as the sheeting is pulled with the universal power crane. A No. 160 Ingersol-Rand Air Compressor is being used for breaking through the frost in advance of the trencher and for driving the wood sheeting.
      • Parent Collections: Louis L. McAllister Photographs


      Sewer Projects
      Image nop
        • Date Created: 1940-02-23
        • Description: February 23, 1940. This view shows the construction of the North End Sewer in front of the George Farrington and the Ralph Thayer residence opposite the entrance to the Burlington Rendering Company's plant. This section of the project is a 15" sewer being constructed entirely with hand labor, using sledge hammers and wedges for excavating through the frost. The Universal Crane used for pulling sheeting and handling materials on the job can be seen in the distance where the excavator is being used for installing the 18" pipe. The depth of the sewer at this location is approximately 12 to 13 feet.
        • Parent Collections: Louis L. McAllister Photographs


        Sewer Projects
        Image nop
          • Date Created: 1937-03-05
          • Description: March 5, 1937. View of a long narrow trench with a manhold seen in the foreground. Long timbers span the trench all down the line.
          • Parent Collections: Louis L. McAllister Photographs


          Sewer Projects
          Image nop
            • Date Created: 1929-06
            • Description: June 1929. Three crew members (and several young boys in the back) are at the sewer project site where a break is in the ravine sewer made by pressure from an exceptional rain storm. Note the clay brick (tile) construction of the damaged pipe and the new metal pipes piled up in back. See also mcalA16F13i32
            • Parent Collections: Louis L. McAllister Photographs


            Sewer Projects (4X5)
            Image nop
              • Date Created: 1932-06
              • Description: June 1932. View of a wide trench down the middle of the street at a sewer project site. Wooden timber structures are seen in the trench. Photo printed backwards as the date is seen written backwards in the lower left corner.
              • Parent Collections: Louis L. McAllister Photographs


              Sewer Projects (4X5)
              Image nop
                • Date Created: 1937-03-05
                • Description: March 5, 1937. Laying pipe at a sewer project site.
                • Parent Collections: Louis L. McAllister Photographs


                Stores, Exteriors
                Image nop
                  • Description: Burlington retail store People's and parking lot.
                  • Parent Collections: Louis L. McAllister Photographs


                  Stores, Interiors
                  Image nop
                    • Description: Interior view of what may be an office supply store. Wall shelves are lined with boxes, soft sided leather brief cases and other supplies. A large selection of pens are seen in the glass display case in front. Folded American flags are also seen on the under shelves of the long front counter.
                    • Parent Collections: Louis L. McAllister Photographs


                    Streets, Roads: Unidentified
                    Image nop
                      • Description: Five telephone poles have been knocked over along this dirt road; their lines still connected.