Burlington Streets: Morse Place
-
Image nop
- Date Created: 1934-03-01
- Description: Photograph dated Mar. 1, 1934. Original caption reads: P.W.A. SEWER PROJECT NO. 2353. A section of Morse Place Sewer near Pine Street. This section is all heavy clay soil with some boulders and was done under sub-zero weather conditions resulting in a much decreased efficiency.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Date Created: 1940-10-16
- Description: Photograph dated Oct. 16, 1940. Original caption reads: North Avenue Concrete Paving Project. This view shows the progress since October 2, 1940 on the north half of the pavement where the work has been continued from Stanford Road northerly to a point near the Plattsburg Avenue intersection. The construction of the westerly slab is just being started at Stanford Road, as shown in the distance.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Date Created: 1940-09-18
- Description: Photograph dated Sept. 18, 1940. Original caption reads: North Avenue Reinforced Concrete Paving Project. This view was taken from the intersection of Plattsburg Avenue looking southerly before any construction work was done.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Street
-
Image nop
- Date Created: 1930-08-18
- Description: August 18, 1930. View looking west on construction completed at North Street and Elmwood Ave intersection. This is a five-point intersection that included Intervale Avenue. Street has been resurfaced covering the old trolley (cable) streetcar tracks. City dept. vehicle steam roller seen to the right. Louis N. Turner, druggist store to the left at the corner advertising candy and cigars. Also on the left is Bloomberg's Shoes at No. 191. To the right on the opposite corner is 202 North St location of Burlington Cut Price Shoe Shop and further down is a sign for Mazel's Dept Store at 194 North St.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Bend Street
-
Image nop
- Date Created: 1938-10-19
- Description: October 19, 1938. City street dept crew work on resurfacing the road.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Pearl St.
-
Image nop
- Description: Undated but most likely late 1920s or early 1930s. No trolley tracks are seen on this view of Pearl Street looking west at the intersection of Pearl and Elmwood Ave. Detailed information on this photo can be seen on UVM's Historic Burlington Project, Burlington, Vermont, South of Pearl Street photographs from 1930s 1940s.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Pearl St.
-
Image nop
- Date Created: 1938-10-10
- Description: October 10, 1938. Intersection of So. Union (at the left), Pearl St (running left to right across the photo) and No. Union (on the right). The building to the left at the corner of Pearl and So Union is 233 Pearl St. Homes and American elm trees line the street. City street dept work at the corner of Pearl and No. Union.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Pine St.
-
Image nop
- Date Created: 1944-10-11
- Description: October 11, 1944. Pine Street Project, D.A. - W.I. No. 4, Burlington, Vermont. (Defense Area - War Industry No. 4) This project financed by the Federal Government as an Access Highway to a Defense Plant was handled and supervised through the Vermont State Highway Department. The construction work was done under contract by D. W. Overocker, Genera; Contractor of Burlington, Vermont. The Pine Street Section of the Project consisted primarily of: - (a) Furnished and placed gravel base approximately 12 inches in depth over the entire length of this section from Howard Street to Flynn Ave. (b) Excavating sections near the intersection of Howard Street including the railroad crossing, the intersection of Lakeside Ave. and the intersection at Flynn Ave. where-ever the old pavement would not permit a minimum depth of 12 inches. (c) Furnishing and installing drainage pipes and constructing catch basins and cross culverts for surface drainage. (d) Constructing 3 inch mixed-in-place asphalt pavement 24 feet in width with 5 foot gravel shoulder on either side. (e) Reconstructing railroad crossing to Tuletex Plant (at expense of E. B. and A. C. Whiting Co.). This view was taken from the intersection of Flynn Ave. looking northerly showing the gravel placed and spread for the 3 inch mixed-in-place wearing surface. Note the tack coat extending on both sides of the gravel as a working surface on top of the 12 inch gravel base.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Pine St.
-
Image nop
- Date Created: 1933-07-12 00:00:00
- Description: July 12, 1933. Pine Street looking south from Main Street. City street dept crew members work on road construction. A steam roller is seen in the central distance. Large brick building on the left is No. 101 Main Street. On the right is No. 149 / 151 and No. 153. More information can be found on UVM's web site on Historic Burlington Project, Burlington, Vermont, South of Pearl Street photographs 1930s 1940s.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Pine St.
-
Image nop
- Date Created: 1940-08-13
- Description: August 13, 1940. This view shows the completed pavement on Pine Street between Flynn Avenue and Lyman Avenue after the 3" sand cushion, 8" telfold base, 2" asphalt penetration base, and 2" asphalt Laykold plant mix had been constructed.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs