Showing 5741 - 5750 of 6620 Records
Burlington Streets: Main Street (Upper)
-
Image nop
- Description: Undated photo (maybe 1920s) of an automobile accident. Car has over turned near an intersection (possibly Willard Street). To the right is a directional road sign indicating Rutland, Middlebury and Vergennes. Another view of this incident is in the collection (mcalA05F1508) and another is published in Images of America Burlington, p. 67.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Main Street (4X5's)
-
Image nop
- Date Created: 1940-03-18
- Description: Mar. 18, 1940. This view shows the Snow King Rotary Snow Plow in section mounted on the front of the Street Department's Walter's Snow Fighter Truck in front of the Post Office on Main Street. Note the discharge spout delivering snow over the high side boards of the five cubic yard truck. This loader is capable of loading a five cubic yard load in less than one-half minutes and has frequently loaded one hundred-five cubic yard truck loads of new fallen snow in approximately one and one-half hours working time including delays because of traffic and street intersections clean up.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Manhattan Drive
-
Image nop
- Description: Undated photo but may be 1938 view of road construction along Manhattan Drive. A tanker truck with sign reads "Hot Asphalt, Standard Oil Co of N Y." A crew member of the Burlington Street Dept stands at the back of the truck.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Maple Street
-
Image nop
- Description: Undated photograph taken at the intersection of Pine and Maple Street showing the apartment building on the northwest corner of the intersection.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Morse Place
-
Image nop
- Date Created: 1934-03-01
- Description: Photograph dated Mar. 1, 1934. Original caption reads: P.W.A. SEWER PROJECT NO. 2353. A section of Morse Place Sewer near Pine Street. This section is all heavy clay soil with some boulders and was done under sub-zero weather conditions resulting in a much decreased efficiency.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Mill St.
-
Image nop
- Date Created: 1941-11-01
- Description: Photograph dated Nov. 1, 1941. Looking westerly, the bridge crossing the Winooski River can be seen. Original caption reads: Mill Street, Burlington, Vermont showing completed job. American Bitumuls Stabilizer being used for 4 1/2" stabilized base on which a 2" penetration armour coat has been constructed. The sidewalk at the right was constructed with soft coal cinders and stabilized with Bitumuls Stabalizer.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Street
-
Image nop
- Date Created: 1930-08-18
- Description: August 18, 1930. View looking west on construction completed at North Street and Elmwood Ave intersection. This is a five-point intersection that included Intervale Avenue. Street has been resurfaced covering the old trolley (cable) streetcar tracks. City dept. vehicle steam roller seen to the right. Louis N. Turner, druggist store to the left at the corner advertising candy and cigars. Also on the left is Bloomberg's Shoes at No. 191. To the right on the opposite corner is 202 North St location of Burlington Cut Price Shoe Shop and further down is a sign for Mazel's Dept Store at 194 North St.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Date Created: 1940-09-18
- Description: Photograph dated Sept. 18, 1940. Original caption reads: North Avenue Reinforced Concrete Paving Project. This view was taken from the intersection of Plattsburg Avenue looking southerly before any construction work was done.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Date Created: 1940-10-16
- Description: Photograph dated Oct. 16, 1940. Original caption reads: North Avenue Concrete Paving Project. This view shows the progress since October 2, 1940 on the north half of the pavement where the work has been continued from Stanford Road northerly to a point near the Plattsburg Avenue intersection. The construction of the westerly slab is just being started at Stanford Road, as shown in the distance.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Bend Street
-
Image nop
- Date Created: 1938-10-19
- Description: October 19, 1938. City street dept crew work on resurfacing the road.
- Parent Collections: Louis L. McAllister Photographs