Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1942-01-12
- Description: January 12, 1942 Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Howard St.
-
Image nop
- Date Created: 1945-07-26
- Description: July 26, 1945. Howard Street Pavement Project. This view was taken at the intersection of Hayward Street looking westerly shows the condition of the upper half of the old street surface, also the condition of old curb and gutter and sidewalk on the northerly side before excavation work was done. More info can be found on UVM's Historic Burlington Project, Burlinton, Vermont, (South of Pearl Street photographs from 1930s 1940s)
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Institute Road
-
Image nop
- Date Created: 1946
- Description: March 22, 1946 Institute Road - Rock Excavation Street Widening Project. This view looking easterly toward North Ave. shows the work after it was practically completed on the south side. Note the large stump in the center background being hauled on a stoneboat by the four-wheel drive Walter truck. Approximately 650 cubic yards of rock excavation was removed from both sides of the street and used for filling and widening the shoulders. This project was requested by the Park Department to improve the safety of the traveling public in getting to and from North Beach. The work was done by the Street Department.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Description: Undated photograph showing a work crew drilling holes at the start of the blasting project on the hill located just north of Institute Road on North Avenue. This stretch of North Avenue has yet to be paved, and the tracks of the trolley line can be clearly seen in this photograph.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Date Created: 1934-05-02
- Description: Photograph dated May 2, 1934. Original caption reads: P.W.A Project #2232 A view of North Avenue widening Project looking southerly. The excavation of the road bed has been completed in this section and has part of the Telfold base in place.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Description: Original caption reads: Mouth of River Project. This view taken from a point about midway of the road on the lower level shows the old narrow road covered with snow and ice and trees on the right with stumps and trees on the left nearly preventing the possibility of meeting in safety, and the overhead archway of evergreen trees preventing the sun and light from penetrating the road area.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Ave
-
Image nop
- Description: Original caption reads: Mouth of River Project. This view taken from the top of the hill looking northerly down the grade shows the condition of the old road bed and the slope where trees had been removed.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Street
-
Image nop
- Description: Undated but probably 1930 view looking east after the resurfacing of North Street was completed by the city street dept. Shell gas station is to the right. A Flynn Theatre poster is attached to a lamp post also on the right just opposite the gas pump.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: North Bend Street
-
Image nop
- Date Created: 1945-07-12
- Description: July 12, 1945. North Bend Street Asphalt Pavement Project. This view taken from the intersection of Pitkin St. and Ward St. looking westerly shows the preparation of the crushed stone base on the northerly half of the street before receiving the asphalt penetration. Note the windrows of excavated material along the shoulder of the street back of the curb where it was pushed with the aid of a heavy duty power grader to eliminate hand labor and hauling off the job.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Pearl St.
-
Image nop
- Description: Undated but may be late 1920s or early 1930s near the intersection of Pearl Street and Elmwood Ave. looking north along Elmwood. City street dept crew repaves the road. To the right is the iron fence surrounding the green near the Unitarian Church located at the head of Church Street.
- Parent Collections: Louis L. McAllister Photographs