Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 7741 - 7750 of 9221 Records

Buildings: Unidentified
Image nop
    • Date Created: undated
    • Description: White factory building with clerestory windows in winter landscape. See also mcalB10F25i03
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Airport
    Image nop
      • Date Created: 1935-06-12
      • Description: June 12, 1935. Photo #3. Caption on this 1935 photo reads "#3 Burlington Vt. 6-12-35 Proj. # 402-B15-1 VERA (Vermont Emergency Relief Administration) Burlington Municipal Airport - West Section of E + W Runway showing excavated material on either side being loaded with power shovel and used for grading also drainage system being installed and crushed stone being placed on sand subbase(?) for stabilization work with Asphalt Emulsion."
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Airport
      Image nop
        • Date Created: 1944-03
        • Description: Burlington Street Department, Burlington, Vt. Photo dated March 4,1944 This view shows the Snow King Rotary Plow operated by the Walter Snow Fighter truck blowing snow from Burlington Municipal runways. Note the force and distance at which the snow is blown, also note the depth of the snow as shown by the picket fence and the boundary light below the surface of the snow in the foreground.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Airport
        Image nop
          • Date Created: 1941-07-11 00:00:00
          • Description: July 11, 1941. Burlington Municipal Airport, WPA (Work Projects Administration) Project. This view is taken from the northerly edge of the east-west runway area directly in line with the centerline stakes of the diagonal runway looking northwesterly. The small pine trees have nearly all been cut with the exception of a small group which can be seen in the left background of the picture on this date and for a distance of approximately 250 feet to the right of the hard surface shoulder of the proposed paved runway. The WPA construction shacks can be seen in the right background while the power shovel and trucks are working at a point near the intersection of the northerly end of the north-south runway.
          • Parent Collections: Louis L. McAllister Photographs


          Burlington Airport
          Image nop
            • Date Created: 1941-06-19 00:00:00
            • Description: June 19, 1941. Burlington Municipal Airport, WPA (Work Projects Administration) Project. This view shows the fill being made along the southerly boundary line of the east-west runway area. Note the hangar and Administration Building directly to the west in the background of the picture, also the boundary fence in the left foreground at the front of the slope. Several thousand cubic yards of filling was dumped in this area using materials excavated from the runway areas and other areas being cleared of small pines and scrub growth. This filling could not be used for any areas within the paved section because of the great amount of roots and stumps but was satisfactory for straightening the line on this area which would not be used for landing purposes and helped to eliminate a hazardous condition. The filling of this area will also assist in straightening the boundary lights when they are permanently installed. Dump truck seen in upper right corner.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Airport (4X5's)
            Image nop
              • Date Created: 1941-09-27 00:00:00
              • Description: September 27, 1941. Burlington Municipal Airport, WPA (Work Projects Administration) Project. This view is taken from a point at the intersection of the center line of the diagonal runway with the easterly shoulder of the north-south runway as shown by the joint across the foreground of the picture. The crew is laying cold asphalt plant mix three inches in thickness on the 4 1/2 inch stabilized base. Camel's Hump can be seen in the background almost directly in line with the center line of the runway.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Street Department Buildings (Pine Street)
              Image nop
                • Date Created: 1934-07-20 00:00:00
                • Description: July 20, 1934. P.W.A PROJECT NO. 2215 A view showing the north and east elevations of the Central Plant. The dates 1865-1934 embedded in the top of the building.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Sand and Gravel Plant
                Image nop
                  • Description: Gravel Bin Structure at the Burlington Sand and Gravel Plant in this undated photo (may be 1930s)
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Street Department Buildings - Construction of Building
                  Image nop
                    • Date Created: 1934-03-01
                    • Description: March 1, 1934. P.W.A. (Public Works Administration) Project Docket No. 2215 A view looking easterly during the pouring of the foundation walls of the Street Dept. Central Plant Building on section near Pine St.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Street Department Buildings - Interiors
                    Image nop
                      • Description: P.W.A. PROJECT NO. 2215 A view of the interior of garage with unit heaters, work benches, concrete floor, etc.
                      • Parent Collections: Louis L. McAllister Photographs