Showing 7761 - 7770 of 9221 Records
Burlington Streets: College Street
-
Image nop
- Date Created: 1929-08-25 00:00:00
- Description: Aug 25, 1929 dated photo. Pouring concrete base on College Street in front of College Street Congregational Church. Note the construction of the base showing dowels spaced 5' on centers. This concrete base was constructed in 3--10' slabs 6" in thickness with 30" gutters on either sides extending 2" above the concrete base allowing for the surface coarse of Asphalt 2" in thickness. This work is all done by City labor and City equipment of the Burlington Street Dept. Fletcher Free Library can be seen in the background on the right.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Elmwood Ave.
-
Image nop
- Date Created: 1927-09-27 00:00:00
- Description: Sept 27, 1927 dated photo. On the right is the Elmwood Ave. Cemetery.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Grove St.(4X)
-
Image nop
- Date Created: 1939-10-24
- Description: Photograph dated Oct. 24, 1939. Original caption reads: WPA [Work Projects Administration] Street Paving Project No. 665-12-2-38(Grove Street) This view shows a section of Grove Street looking northerly from the break of grade near the Charles Kirby residence. The telford stone base and crushed stone base leveling course had been completed at this stage of the construction and one-half gallon per square yard of 85-100 penetration asphalt binder had been applied to the base leveling course as a tack coat. The two inch wearing course of crushed stone has just been started in the left of the picture. The stone rubble at the right is for use in continuing the construction of the base. The heavy cut just northerly of the bridge can be seen in the distance as well as the rock quarry at the extreme right where all stone rubble for the telford base is being quarried.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Grove St.
-
Image nop
- Date Created: 1940-11-21
- Description: Photograph dated Nov. 21, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the improvement on Grove Street looking southerly from a point near the end of the curb at the northerly end of the project opposite the W.C. Kirby residence. The old quarry pit has been completely filled in the right foreground from excavation taken from the back slope on the shoulders on the right side of the street after having quarried enough stone rubble from the old pit to construct all of the telford stone base for this project.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Flynn Ave.
-
Image nop
- Date Created: 1931-04-27
- Description: Photograph dated April 27, 1931 looking westward at the preliminary work of the road widening project on Park Avenue (renamed Flynn Avenue) Photograph taken below Pine Street (note statue of St. Anthony at left)
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Intervale Rd.
-
Image nop
- Date Created: 1928-11-26 00:00:00
- Description: November 26, 1928. Washout on Intervale Road caused by flood of Nov. 4, 1927 as it looked just before starting work of construction of new road Nov. 1928.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Intervale
-
Image nop
- Date Created: undated
- Description: Undated but may be from around 1930. This is a neighborhood grocery store located at the intersection of Riverside Ave and Intervale Ave. This photo appears in "Images of America Burlington, Vol. 2, p. 60. Authors suggest this store may have been owned by Sophia Saiger as she is listed as being a grocer in the 1930 city directory and residing at 178 Intervale Ave.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1934-04-13
- Description: April 13, 1934. P.W.A. Sewer Project No. 2353. South Park. A section of Hayward Street sewer looking north and after backfill is nearing completion. Note wet condition of terrain which necessitated pumping during excavation preceding the laying of the tile and the addition of a 6" sand cushion under tile.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Main Street (Lower)
-
Image nop
- Date Created: 1943-05-05
- Description: May 5, 1943. Rail Removal Project. Burlington, Vermont by the city street dept. This view, looking east up the hill, shows Rail Removal Project at intersection of Main Street and So. Winooski Ave. where a hot-mix asphalt pavement had been constructed over the top of the rails to a depth of 2 to 3 inches. On the right are businesses that include (extreme right) Kent-Thomas Co advertising Armstrong tires at 211-213 Main, further up is 229 Main location of Nourse's restaurant. Across the street at 220 Main is the Chittenden County Jail, J. Frederick Lynch, county sheriff.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Main Street (Upper)
-
Image nop
- Description: Undated photo (maybe 1920s) of an automobile accident. Car has over turned near an intersection (possibly Willard Street). To the right is a directional road sign indicating Rutland, Middlebury and Vergennes. Another view of this incident is in the collection (mcalA05F1508) and another is published in Images of America Burlington, p. 67.
- Parent Collections: Louis L. McAllister Photographs