Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 7971 - 7980 of +10000 Records

Burlington Streets: North Bend Street
Image nop
    • Date Created: 1939-08-15
    • Description: August 15, 1939 PWA Project No. Vt. 1097-F This view shows the completed pavement at the intersection of North Bend Street and Ward Street. The old road bed was scarified, reshaped and treated with stabilizing emulsion late in the fall of 1938 and a base course of asphalt penetration was constructed with one application of 85-100 penetration asphalt binder. A wearing surface of two inches of Plant-Max asphalt using tempering fluid was constructed during the early summer of 1939.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: North Bend Street
    Image nop
      • Description: This view shows the entrance, to the proposed City Dump on the Intervale where it starts at the intersection of St. Louis Street and North Bend Street just as work was being started Saturday morning, May 23, 1942.
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Streets: Pearl St.
      Image nop
        • Date Created: 1934-04-23
        • Description: April 23, 1934 view of Pearl Street. Elm trees and dwellings line both sides of the road. A filling station is to the right. On the left cement steps are seen leading from the curb across the green belt (tree belt) to nearby homes. Automobiles are parked along the sides of the street as others travel along it.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Streets: Pine St.
        Image nop
          • Date Created: 1933-07-12 00:00:00
          • Description: July 12, 1933. Burlington street dept crew members working at the southeast corner at intersection of Pine Street and King Street with several children watching. Asphalt or some other road material being laid. Steam roller at center right. Seen is Number 79 / 81 King Street. Leary's Market at No. 79. The word "creamery" is seen in the window. More information on this photo can be found at UVM's web site on Historic Burlington Project, Burlington, Vermont, South of Pearl photographs from 1930s 1940s.
          • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


          Burlington Streets: Riverside Ave.
          Image nop
            • Date Created: 1935-1936
            • Description: 1935/1936 view of Riverside Ave. at North Prospect Street showing the street and debris on the right side. Homes and businesses are seen including a Shell filling station. The photographer's shadow was also recorded as seen at the bottom of the photo.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: Riverside Ave.
            Image nop
              • Description: Undated photo (1929 or early 1930s?) of Riverside Ave showing road construction project by the city street dept crew. Billboards are seen in the background including one advertising Lucky Strike cigarettes. Filling station seen to the left may be Fairview Garage of 110 Riverside Ave.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Streets: Riverside Ave.
              Image nop
                • Date Created: 1929-10-21
                • Description: October 21, 1929. View of Riverside Ave after resurfacing of the road by the city street dept approaching the Winooski Bridge. Old mill on the left (later converted to Forest Hills Factory Outlet) was a branch of the American Woolen Company and known as Champlain Mills. This mill is on East Canal Street, Winooski.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Streets: Shelburne Road.
                Image nop
                  • Date Created: 1935-11-01
                  • Description: Photograph dated Nov. 1, 1935. Original caption reads: This view shows the street intersection of Ledge Road and South Willard Street where the curb has been recessed approximately twenty-five feet and the asphalt pavement has been reconstructed to allow for better traffic conditions on U.S. Route No. 7 leading north from Shelburne Street through Willard Street.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Streets: Staniford Road
                  Image nop
                    • Description: This view of Staniford Road shows the thorough mixing of the pavement materials after the dry mixing of the cement and the addition of water. Note the work of the power grader along the gutter line where the blade has removed the materials for the full depth of the thickness of the gutter. Power grader can be seen in the distance as well as the asphalt distributor used in applying the water. The tractor and heavy duty double 8 inch disc harrow shown in the foreground did a very satisfactory job in mixing. Work by Burlington Street Dept. Undated but may be 1942.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Streets: Staniford Road
                    Image nop
                      • Description: This view of Staniford Road shows the Bower Grader wind rowing the pavement mixture toward the gutter to the crown leaving the surface to a uniform crown and grade. Work by Burlington Street Dept. Undated but may be 1942.
                      • Parent Collections: Louis L. McAllister Photographs