Showing 791 - 800 of 6620 Records
Burlington Streets: Cliff Street
-
Image nop
- Date Created: undated
- Description: Construction crew works on Cliff Street in Burlington. View is looking toward intersection of South Willard Street. A wide trench has been dug. Rocks fill the truck. Date is difficult to see but may Feb. 26, 1938.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Church St. (4X5)
-
Image nop
- Date Created: undated
- Description: Winter view of Church Street looking south. Men with snow shovels, a horse drawn vehicle and automobiles can be seen.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: DeForest Road
-
Image nop
- Date Created: 1935-11-19 00:00:00
- Description: Nov. 19, 1935 dated photo. Soil Stabilization by A.M. Bitumuls Co. Bitumulus Stabilizer being used on DeForest Road.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: College Street
-
Image nop
- Date Created: 1929-08-25 00:00:00
- Description: Aug. 25, 1929 dated photo. Burlington Street Dept crew pouring concrete base on College Street in front of New England Telephone & Telegraph Company Office Building, 260 College. Construction vehicles and bags of paving materials on wooden pallets.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: DeForest Road
-
Image nop
- Date Created: 1935-11-19 00:00:00
- Description: Nov. 19, 1935 dated photo. Soil Stabilization by A.M. Bitumuls Co. Bitumuls Stabilizer being used on DeForest Road.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Flynn Ave.
-
Image nop
- Date Created: 1931-04-27
- Description: Photograph dated April 27, 1931 looking westward on Park Avenue prior to the widening/paving project. In the distance can be seen St. Anthony's Church (left) and Champlain Elementary School (right).
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1934-04-13
- Description: April 13, 1934. P.W.A. Sewer Project Docket No. 2353. South Park. A section of Hayward Street sewer looking south showing manhole in center of section which was of unusual construction due to ravine intersection with sewer main.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1942-01-12 00:00:00
- Description: January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Intervale
-
Image nop
- Date Created: 1946-06-29 00:00:00
- Description: June 29, 1946. Burlington Street Department - Burlington, Vermont Intervale Road - Asphalt Stabilized base and Armor Coat Wearing Surface This view taken from the railroad crossing looking southerly toward Riverside Ave. shows the mixing process while constructing the stabilized base using asphalt emulsion (XRM) as a binder. The materials used for aggregate on this job was road gravel hauled from the Lunderville Pit in the town of Williston last October and spread approximately 28 feet in width over the entire section from Riverside Ave. to the railroad crossing, a distance of approximately 875 feet. Note the Allis-Chalmers Power Grader mixing the gravel after the asphalt emulsion had been applied by pressure distributor. The Armor Coat Wearing Surface was constructed directly after the stabilized base had been completed. This is a very economical type of paving, especially where a cheaper grade of materials can be used and the location does not demand a higher type of pavement. Note the high embankment in the right background where several thousand cubic yards of filling was loaded by the Street Department with its power shovel and hauled with trucks to widen both sides of Intervale Road on the section between the railroad crossing and Riverside Ave. as well as the grading around the new catch basins and the filling of the ramp on the river bank where the undertile drainage pipe leads to the river. All of this filling was donated free of charge by the owner of the property (Geo. C. Stanley and Sons) to the City as well as a considerable amount of concrete sand and gravel for the construction of concrete catch basins and headwalls in connection with the drainage system. This project, which was approved for construction by the Board of Street Commissioners in June 1945 was practically completed on July 3, 1946 for the first section. The original plans included the second section from the railroad crossing northerly to a point approximately 100 feet northerly by the so-called Pariseau residence. This section was prepared last fall as to the grading and gravel surface and as no underground drainage is necessary it can be completed with very little expense as the only materials necessary to purchase will be asphalt emulsion.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Institute Road
-
Image nop
- Date Created: 1946-06-29 00:00:00
- Description: June 29, 1946 Institute Road - Rock Excavation Street Widening Project. This view looking easterly from the intersection of the road leading to Bishop Hopkins Hall looking toward North Ave. Shows the appearance of the sidewalk and filling as it was being constructed. Note that the sidewalk was placed parallel to the street line and a sufficient distance from the trees to avoid any injury to the trees.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs