Showing 821 - 830 of 1092 Records
Burlington Airport
-
Image nop
- Date Created: 1937-09-07
- Description: September 7, 1937 photo of the back side of the wooden hangar showing open framework on the upper story and a black piece of sheeting (construction material) hanging vertically on the wall. Workers seen on the upper story.
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1945-03-07
- Description: Burlington Street Department, Burlington, Vermont. Burlington Municipal Airport. Photo dated Mar. 7, 1945. This view taken from a point just easterly of the Administration Building shows the completed south wing and winter storm house. Beacon tower also shown. Note the balanced appearance which the new wing gives to the building. This wing was designed and supervised under direction of the City Engineer's Office and constructed by Wright & Morrissey, Contractors, the work being completed in Dec. 1944. Various wheeled carts in front.
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1944-09-12
- Description: City of Burlington, Vermont - Municipal Airport Administration Building: - Photo dated Sept 12, 1944 This view shows the north wing and the main section of the Administration Building as seen from the north west angle. Notice the closeness of the metal hangar on the south side of the building leaving only a narrow passageway. The office on the north east corner of the wing where entrance door is shown is occupied by the U.S. Weather Bureau. The north west corner office where triple windows are shown on both north and west sides of the building is occupied as an instrument room for the C.A.A. operations. The office indicated by the double window at the rear entrance is occupied by the U.S. Immigration and the office directly to the east on the front of the building is occupied by the U.S. Customs. It is proposed to remove the metal hangar and reset it just south of and in line with the wooden hangar to make room for the construction of a south wing identical in size with the north wing to balance the architectural lines of the building and to provide new office space for the U.S. Immigration and Customs. The old offices in the north wing thus vacated would be redecorated and some alterations made to provide accommodations for the Northeast Airlines, Inc. who expect to resume service in October 1944.
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1944-10-11
- Description: City of Burlington, Vermont - Municipal Airport Photo dated Oct. 11, 1944. This view taken from in front of the Administration Building shows the space between the wooden hangar and the Administration Building after the metal hangar had been removed and excavation fro the foundations for the new south wing had been started.
- Parent Collections: Louis L. McAllister Photographs
Burlington Asphalt Plant (4 X 5)
-
Image nop
- Date Created: 1946-06-29
- Description: This view taken from the Rutland Engine House shows the entire Asphalt Plant and yard with stock pile of sewer and asphalt aggregate. Note the comparison between this view and the previous picture taken in 1924 soon after the erection of the plant.
- Parent Collections: Louis L. McAllister Photographs
Burlington City Hall
-
Image nop
- Date Created: undated
- Description: Group of men and boys, 26 individuals, posed on the steps of Burlington City Hall
- Parent Collections: Louis L. McAllister Photographs
Burlington City Hall
-
Image nop
- Date Created: 1937
- Description: This view shows our new Elgin Sweeper near Burlington City Hall after having gone through its demonstration ready for service. This street sweeper was delivered on April 13, 1937 and replaced the old Elgin which had given satisfactory service for fourteen years. City Hall Park with its elm trees is visible.
- Parent Collections: Louis L. McAllister Photographs
Burlington City Hall
-
Image nop
- Date Created: 1927
- Description: May 2, 1927. Construction of Burlington City Hall, fire station tower visible. Sign for James E. Cashman, General contractor clearly seen at the corner of the building.
- Parent Collections: Louis L. McAllister Photographs
Burlington Dump
-
Image nop
- Date Created: 1944-08-03
- Description: August 3, 1944. This view shows the completed building at the Municipal Refuse Disposal Grounds consisting of the main Salvage Depot shown in the center which is approximately 100 feet in length by 30 feet in width with small garage attached at one end also tool shack at left which is used for warming house in winter, and hose house shown at right in the distance. All buildings are covered with sheet metal, roofs and siding, for fire protection. The hose house is built over a concrete underground manhole which houses the water meter and provides a 2 inch water main with approximately 300 feet of fire hose for emergency use. All buildings have been painted with a camouflage gray paint, asphaltum base, and were constructed almost entirely with salvaged materials and by Street Department employees. This picture also shows the newly constructed mixed-in-place roadway in front of the buildings.
- Parent Collections: Louis L. McAllister Photographs
Burlington Street Department Buildings (Pine Street)
-
Image nop
- Description: Central Plant of the Burlington Street Department
- Parent Collections: Louis L. McAllister Photographs