Showing 1 - 10 of 71 Records
Constructed 1934
-
Image nop
- Date Created: 1934
- Description: New bridge on the Otter
- Parent Collections: Photographs of Vergennes (Vt.)
Burlington Airport
-
Image nop
- Date Created: 1934-1935
- Description: July 18, 1935. Photo #14. Caption on this 1935 photo reads "#14 Burlington Vt. 7-18-35 VERA (Vermont Emergency Relief Administration) Proj # 402 B25-1 Burlington Municipal Airport East end of E + W runway. Construction of Armour coat consisting of 1" chestnut stone covered with pea stone after 1st and 2nd application of quick breaking emulsion sand covering over 3rd application.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1934-1942
- Description: April 13, 1934. P.W.A. Sewer Project Docket No. 2353. South Park. A section of Hayward Street sewer looking south showing manhole in center of section which was of unusual construction due to ravine intersection with sewer main.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Burlington Streets: Main Street (Upper)
-
Image nop
- Date Created: 1934-07-20 00:00:00
- Description: July 20, 1934 N. R. M. Project #60-B Main Street (U.S. Route 2) - This view shows the pavement construction which included resurfacing and widening as seen from the junction of Main St. and University Place looking in an easterly direction near the University of Vermont campus. To the right is the city water reservoir and Pump House.
- Parent Collections: Louis L. McAllister Photographs
Vermont Alumni Weekly vol. 13 no. 21
-
Image nop
- Creator: University of Vermont
- Date Created: 1934
- Parent Collections: University of Vermont Alumni Publications, Vermont Alumni Weekly
Vermont Alumni Weekly vol. 13 no. 25
-
Image nop
- Creator: University of Vermont
- Date Created: 1934
- Parent Collections: University of Vermont Alumni Publications, Vermont Alumni Weekly
Vermont Alumni Weekly vol. 14 no. 04
-
Image nop
- Creator: University of Vermont
- Date Created: 1934
- Parent Collections: University of Vermont Alumni Publications, Vermont Alumni Weekly
Burlington Streets: Hayward St. & Hayward St. Sewer
-
Image nop
- Date Created: 1934-1942
- Description: January 24, 1942. Hayward Street Improvements: This view shows the application of the hot asphalt emulsion being applied into the stone base or binder course. This binder course is approximately two inches in thickness and is laid on top of the eight inch telford stone base which is constructed on a six inch sand cushion. Note the old concrete curbs on the east side of the street and the absence of the curbs on the west side of the street where the undertile drain has been constructed. New integral concrete curb and gutter will be constructed in the spring.
- Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs
Road Construction
-
Image nop
- Date Created: 1934-03-06
- Description: March 6, 1934. City Burlington, Vermont. CWA (Civil Works Administration) Project #402-J. Telford stone base construction and crushed stone surface. Note winter conditions. Wished someone had noted the location.
- Parent Collections: Louis L. McAllister Photographs