Showing 1 - 10 of 352 Records
Bridges, Potash Brook
-
Image nop
- Date Created: 1928
- Description: Workers constructing bridge improvement, Potash Brook, South Burlington
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Bridges, Potash Brook
-
Image nop
- Date Created: 1928
- Description: Workers constructing bridge improvement, Potash Brook, South Burlington
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1935-07-18
- Description: July 18, 1935. Photo #14. Caption on this 1935 photo reads "#14 Burlington Vt. 7-18-35 VERA (Vermont Emergency Relief Administration) Proj # 402 B25-1 Burlington Municipal Airport East end of E + W runway. Construction of Armour coat consisting of 1" chestnut stone covered with pea stone after 1st and 2nd application of quick breaking emulsion sand covering over 3rd application.
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1934-11-27
- Description: November 27, 1934. Photo #20A. This picture shows the starting of the grading of the east-west runway, just east of its junction with the north-south runway. Hand labor was used as much as possible in accordance with the V.E.R.A (Vermont Emergency Relief Administration) principles. Caption on this 1934 photo reads ""#20A 11-27-34 Municipal Air Port Project - Grading East end of East and West runway with VERA labor."
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1934-07-27
- Description: July 27, 1934. Photo # 4A. A view looking north from south end of the north-south runway showing the grading work in process which was done under the V.E.R.A. (Vermont Emergency Relief Administration). Note the opening at northern end where the trees and undergrowth have been removed to obtain better vision. Caption on this 1934 photo of construction of the Burlington Municipal Airport reads "#4A 7-27-34 Grading North and South Runway with VERA labor looking North from South end of runway."
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1937-06-22
- Description: Construction of the hangar at the Burlington Municipal Airport in this dated photo of June 22, 1937. Construction workers can be seen on top. Row of supplies seen at the base of the building near a ladder.
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1937-10-12
- Description: October 12, 1937 photo of the open side of the wooden hangar during construction at the Burlington Vermont Municipal Airport. One of the bay panels is seen center in the opening. Construction workers in and around the structure.
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1944-10-03
- Description: City of Burlington, Vermont - Municipal Airport Photo dated Oct. 3, 1944. This view shows the form work for the south wall of the concrete foundation walls being constructed by Street Department forces for resetting of the metal hangar just south of the wooden hangar. A contract was awarded to the Street Department to build these foundation walls including all materials, labor and equipment for the sum of $1500.00 Several workmen and automobiles seen on site.
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1939-11-23
- Description: November 23, 1939. WPA (Work Projects Administration) Project No. 65-1-12-43. This view shows the penetration of the armor coat on the northerly half of the 1,250 foot extension of the north-south runway. This view also shows the spreading operation of applying the peastone cover with the aid of the rotary type chip spreader as well as the rolling of the surface with a ten ton tandem roller and hand brooming of the peastone cover where necessary. Note the 100 foot radius turning area at the upper right of the picture.
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1935-11-01
- Description: Nov. 1, 1935. Grading at Burlington Municipal Airport with W.P.A labor Project No. 65-12-168. Area is being graded is East of North and South runway and South of East and West runway.
- Parent Collections: Louis L. McAllister Photographs
Part of: Louis L. McAllister Photographs