May, 5, 1943. Rail Removal Project, Burlington, Vermont. This view shows 3 stages of the project on Main St. in front of the U.S. Post Office (on the left). In the foreground can be seen the concrete base which is just being poured in the trench on the right and the sub-base ready to receive the concrete in the trench on the left, also 6 inch header at point of switch. The trench on the right beyond the header is ready for the rail to be removed. The rail is being removed in the background from the trench on the left by aid of the "A" frame and derrick. 2 inch hot asphalt plant mix will be constructed on top of the concrete base to finish the pavement. Also on the left center is the mansard roofed building that once was a place of worship for the First Baptist Church. Across the street from that building is seen a corner of the City Hall. On the right are businesses including the Federal Savings and Loan.