October 2, 1942. Photo No. 21. This view of Staniford Road shows the removal of the header placed at the end of each day's work. Note the planks placed on the surface of the previous day's pavement construction with base material thrown on top of the planks to allow the turning of the equipment. The asphalt distributor is applying water to the sand blotter placed on the surface of the day old completed pavement. Work done by the Burlington Street Dept.