July 1, 1943. This view of Staniford Road at the intersection of North Ave. shows the completed pavement after it had gone through one winter season and the armor coat of asphalt emulsion, stone chips and washed concrete sand had been applied to the surface approximately 1/2 inch in thickness. The unit cost of this project was $.773 per square yard for the Soil-Cement pavement and $.094 per square yard for the Armor-Coat, making a total of $.867 per square yard for the completed project. The total length of this project was 1945 lineal feet and the width between gutters was 27 feet, making a total area of 5835 square yards for the entire project. Work done by the Burlington Street Dept.