November 3, 1942. This view shows the pavement one month after the Soil-Cement had been completed. Traffic had been allowed to use the pavement for the entire period. The intersection in the foreground was constructed of asphalt plant mix. The Soil-Cement pavement was given a light tack coat of asphalt emulsion as a protection coat for the winter.