Burlington Streets: Intervale
Information
Parent Collections - Louis L. McAllister Photographs
Title - Burlington Streets: Intervale
Photographer - McAllister, L. L. (Louis L.), 1877-1963.
Date Created - 1946-06-29 00:00:00
Description - June 29, 1946. Burlington Street Department - Burlington, Vermont Intervale Road - Asphalt Stabilized base and Armor Coat Wearing Surface This view taken from the railroad crossing looking southerly toward Riverside Ave. shows the mixing process while constructing the stabilized base using asphalt emulsion (XRM) as a binder. The materials used for aggregate on this job was road gravel hauled from the Lunderville Pit in the town of Williston last October and spread approximately 28 feet in width over the entire section from Riverside Ave. to the railroad crossing, a distance of approximately 875 feet. Note the Allis-Chalmers Power Grader mixing the gravel after the asphalt emulsion had been applied by pressure distributor. The Armor Coat Wearing Surface was constructed directly after the stabilized base had been completed. This is a very economical type of paving, especially where a cheaper grade of materials can be used and the location does not demand a higher type of pavement. Note the high embankment in the right background where several thousand cubic yards of filling was loaded by the Street Department with its power shovel and hauled with trucks to widen both sides of Intervale Road on the section between the railroad crossing and Riverside Ave. as well as the grading around the new catch basins and the filling of the ramp on the river bank where the undertile drainage pipe leads to the river. All of this filling was donated free of charge by the owner of the property (Geo. C. Stanley and Sons) to the City as well as a considerable amount of concrete sand and gravel for the construction of concrete catch basins and headwalls in connection with the drainage system. This project, which was approved for construction by the Board of Street Commissioners in June 1945 was practically completed on July 3, 1946 for the first section. The original plans included the second section from the railroad crossing northerly to a point approximately 100 feet northerly by the so-called Pariseau residence. This section was prepared last fall as to the grading and gravel surface and as no underground drainage is necessary it can be completed with very little expense as the only materials necessary to purchase will be asphalt emulsion.
Extent - 1 image
Note [Digital Version] - 2007-12-21, Center for Digital Initiatives, University of Vermont Libraries
Type of Resource - still image
Source Document Location - University of Vermont Libraries. Special Collections.
Shelf Location - Louis L. McAllister Photographs, Box A05, Folder 08, Item 06
Publisher - University of Vermont, Silver Special Collections Library
Date Captured - 2007-12-21
Access Conditions - In Copyright
Access Conditions [Local] - For further information please contact Special Collections, University of Vermont Libraries at uvmsc@uvm.edu.
Identifier [Local] - mcalA05F08i06
Digital Format - image/tiff
Digital Format - Photographs/Color: 24 bits; 600 ppi
Other download options
Current document
Format
Pages
The defined range is higher than allowed